Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

In order to achieve that, the connection points for each of the events and timestamps have to be drag-and-dropped onto an appropriate OpOutput block in the Configuration panel of the RT-LAB project.

Connections with LabView Dashboards panels are also possible.

...