Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Table of Contents
minLevel1
maxLevel3
outlinefalse
indent20px
stylecircle
typelist
printablefalse

...

RT-LAB 2025.1.2

Software Toolboxes Installed with

Improved

  • Improved project migration process by allowing the build of unmigrated uncompiled projects.

  • Allowed the migration of projects with invalid connections and warn the client about those missing connections.

Fixed

  • Fixed loading issue with a multi subsystem model when opal-rt board not assigned to the master subsystem.

Dashboards - Signal Visualization and Processing

Include Page
DASH:Release Notes 2025.1.2 - RT-LAB
DASH:Release Notes 2025.1.2 - RT-LAB

RT-LAB 2025.1.0

Software Toolboxes Installed with

Added

  • Added support for MATLAB/Simulink R2024b for RT-LAB and all the toolboxes.

  • Added support for simulations with multiple eHS blocks.

Improved

  • Automatic project migration to the new I/O interfaces.

  • Improved the behavior of RT-LAB when updating the network interfaces. Re-starting isn't required anymore.

Fixed

  • Fixed installation on a path containing a space.

  • Fixed loading issue with a multi subsystem model when opal-rt board not assigned to the master subsystem.

...

  • Removed support for MATLAB/Simulink R2015b, R2018b, R2019b and R2021a for RT-LAB and all the toolboxes.

  • Removed the support for Dynamic LabVIEW® Panels.

  • Removed the Configurations section in the project explorer. Connections are now handled through new I/O interfaces.

Dashboards - Signal Visualization and Processing

Include Page
DASH:Release Notes 2025.1
DASH:Release Notes 2025.1

...