Model name | Two substations with 100 km transmission line |
---|---|
Highlights |
Capable of handling a high number of closely located switches per task |
Model diagram | |
Single-phase nodes | 129 |
Sources (3φ) | 8 |
Transformers (3φ) | 3 |
Single-circuit lines (3φ, Bergeron model) | 1 (with embedded fault breaker) |
Breakers (3φ) and faults (4φ) | 56 + 25 = 81 |
Hardware | OP5707XG
|
Software |
|
Minimum license required | HXG Plus (1 core, 180 nodes) |
Results |
* Performance under transient conditions varying considerably depending on the study type, this benchmark measures the minimum achievable time-step without overruns in steady-state conditions. A rule of thumb is to consider 10 to 20 % buffer time for calculations under transient conditions. |
Benchmark | |
Performance comparison between new (OP5707XG) and previous (OP5700) hardware generations | |
...