Figure 1: Synchronous machine configuration settings


Simulation and Results

As part of the example model setup, the user can perform one scenario. For this scenario, the user can open a template in ScopeView to display the signals.

Scenario 1: Three-phase fault on Bus 5.1

This scenario is about introducing a three-phase fault on Bus 5.1 at 0.1s by 0.1s. The user can change these settings by going into the fault subsystem and changing the values of T1 and T2 , configuring the fault activation and clear times, respectively.

Image Modified

Figure 2: Fault configuration settings


The following are the results from ScopeView following the three-phase fault on Bus 5.1.

...