Documentation Home Page ◇ Hardware Home Page
Pour la documentation en FRANÇAIS, utilisez l'outil de traduction de votre navigateur Chrome, Edge ou Safari. Voir un exemple.
OP8120 Gen 2 Installing a Conditioning Module
When you order a Modular Signal Conditioning Chassis (MSCC), the modules you ordered are factory installed.
Use this procedure to add or replace a module when required.
The OP8120 chassis features rails for easy installation of the conditioning modules in the designated slot.
Position the conditioning module to align with the desired slot and push firmly until the module connector fully engages with the backplane connector.
When the module is in place, secure it with the 4 screws provided.
When all modules are in place, plug the power cord from the connector (located at the back of the unit) into a power source.
Power on the unit using the power switch at the front. The LED should light up.
The signal conditioning chassis is now operational.
For detailed information on each conditioning module, please consult the OP8120 MSCC Modules user documentation.