OP4610XG2 Installation and Connection

Page Contents


  • OPAL-RT strongly recommends the use of anti-static wrist straps whenever handling any electronic device provided by OPAL-RT.

  • Disconnect power before servicing.

  • OPAL-RT simulators and hardware devices may be subjected to electromagnetic interference (EMI) when installed in proximity to other devices.
    Make sure to connect the ground to the rack or strong earth to prevent any EMI-related damage to the simulator.

Tabletop Use

Install the unit on a flat even surface. Make sure to provide all adequate and necessary ventilation (at least 10 cm or 4 inches) on both sides and at the back.

Rack Mount

Usually, the rack mount brackets and handles are already assembled to the chassis. Insert the chassis in a rack and secure it in place. The rack will fit in a standard 19-inch rack.

Hardware List 2x 110-3124 - 3U Rack Mount Brackets  2x T00-8185 - Pull Handles Black Anodized Alu. 8-32 x 3.5” 4x T00-6800 - Black SS Phillips Flat Head Screws 8-32 X ½” long 8x T00-8180 - Black, SS, Phillips Flat Head Screws 6-32 x 5/16” long Assembling Follow these simple steps to install the brackets and the handles. For each side: Remove the two (2) top front screws. Put the screws away, they will be replaced with longer ones. Assemble the rack mount bracket using 4 screws. Do not use the screws you removed in the previous steps, they are too short. 4 screws per bracket, 6-32 x 5/16" flat head, Phillips, OPAL-RT P/N T00-8180 Assemble the handle to the bracket using two (2) screws. 2 screws per handle, 8-32 x ½” flat head, Phillips, OPAL-RT P/N T00-6800 If there is a unit in the rack underneath the OP4610XG, you may need to remove the 4 rubber feet by unscrewing them.

Connecting the Cables and Powering on the Unit

image-20260226-213305.png
  1. Connect the power cord to the unit and to the appropriate power source (outlet).

  2. Plug in an Ethernet cable to the IPMI RJ45 port at one end and to your network at the other end.

  1. Connect an Ethernet cable to the default network interface at one end, and to your network at the other end.

  2. OPTIONAL: If present, connect the communication cables between the simulator and the external device. For example, connect one end of a PCIe cable to the PCIe host adapter and the other end to another unit, most likely an FPGA processor and I/O expansion unit.

  3. Turn on the main power switch in the back.

Make sure that all cables are properly connected before powering up.
Make sure that the main power switch at the rear of the unit is easily accessible for emergency shutdown.

To turn on the simulator, press the front On/Off button.

image-20251106-213053.png

Connecting the Ground Screw

If the unit is installed in a rack, you must connect a grounding cable from the OP4610XG2 ground screw to the rack to ensure that the OP4610XG2 terminates securely in a ground.
Proper grounding helps prevent electric shocks, protects the simulator from voltage spikes (from various causes, including lightning strikes), and provides increased immunity from EMI by lowering noise levels and emissions.

  • Select a flat braided grounding strap of adequate length (as short as possible to provide the best protection), with ring terminals on each end.

  • Attach one ring terminal to the ground screw on the OP4610XG2.

  • Attach the other ring terminal to the rack using a nut and lock washer.

Make sure that the power switch at the rear of the unit is easily accessible for emergency shutdown.

Connecting the Synchronization Cable

The OP4610XG2 offers two synchronization options: via optical fiber (recommended) or via legacy copper cable.

The synchronization link must be daisy-chained between all chassis participating in the simulation.
The system that is configured to be the Master of the synchronization in the RT-LAB or HYPERSIM software is the head of the daisy chain, and the synchronization cable must be connected to the TX output of this system.

The other end must be connected to the RX input of the second system to be synchronized (configured as Slave in the software).
If there are more than two systems to synchronize, another cable must be installed between the TX output of the second system and the RX input of the third system, etc. until the last system.

The figure below shows the connection via optical fiber:

Connecting synchronization cables

Note: Synchronization cables are not required between an OP4610XG2 and the FPGA processor and I/O expansion unit connected via MuSE since the synchronization link is integrated into the MUSe link.

Connecting a Monitor and Keyboard (Optional)

image-20260112-214516.png

Plugging in a monitor and a keyboard is necessary only in certain rare circumstances when you need to log in to OPAL-RTLinux directly. No mouse is required because OPAL-RT has no graphical interface.
The hardware mentioned below is provided by the customer.

  1. Plug in the monitor cable to the vertical VGA video output port. All other video output ports on the motherboard backplate, on the left, are not available.

  2. Plug the keyboard into one of the four (4) USB ports.

Connecting the I/O Loopback Kit for Test Purposes

The following procedure is only used for test purposes when no external source is available.

The loopback kit included in the starter kit allows users to test system signals. The connection is made easy with a custom flat cable that matches OPAL-RT standard DB37 pin assignments.

  • Connect one end of the flat cable to the loopback board.

  • Connect the loopback board to the simulator DB37 output signal.

  • Connect the other end (DB37 connector) of the flat cable to the simulator DB37 input signal.

  • Connect the Vuser (required to preserve isolation) from the loopback board to the OP4610XG2.

For more information about the use of Vuser and Vrtn please refer to this article in the OPAL-RT knowledge base: Powering DB37 Boards for Digital Output Modules.

 

Connecting the loopback kit

Although some boards do provide a power source, using that would compromise the isolation.
OPAL-RT recommends using an external power source:

  • The user must connect the power wires (provided) to either a 5 or 12 V power source.

  • Make sure that the Vuser source switch on the loopback board is set to “External”.

Connecting the DB37 Breakout Board (Optional)

The breakout board allows users to access each pin of the DB37 separately through the screw terminals.
Simply insert the breakout board DB37 connector onto the desired DB37 connector on the simulator.

Simply insert the breakout board DB37 connector onto the desired DB37 connector

Refer to the System Description Document delivered with your system on a USB key or refer to the user manual of the OP5300 Mezzanine Modules installed in the system for exact pin assignments.