Choosing an Appropriate Location

Structural Requirements

The OP1400PR test benches are fairly heavy sets of equipment (up to 600 kg for the heaviest models when incorporating optional equipment), thus care should be taken when choosing the installation location for the test bench. OPAL-RT highly recommends that the building structure where the bench will be sitting is designed to support at least one metric ton (1000 kg) of weight.

Available Space

image-20251110-183356.png

The final location for the OP1400PR test bench should take into account the dimensions of the cabinet (shown in the image above).

Please note that the two side panels and the rear panel are hinged doors that may need to be open from time to time to reconfigure wiring or for maintenance reasons. Although it is not necessary to provide permanent clearance for the side and rear doors, it is recommended to at least confirm that there is enough space and enough loose wiring to roll the chassis in order to gain access to the doors.

The OP1400PR test bench cabinet is equipped with a fan installed at the top for ventilation. Therefore, the top of the cabinet must not be obstructed in any way that will disrupt the airflow from the fan. There must be at least 6 inches of free space between the ceiling and the top of the cabinet.

Environmental Conditions

OPAL-RT requires that the following environmental conditions be met at the installation site of the OP1400PR test bench:

Parameter

Ideal

Mandatory

Parameter

Ideal

Mandatory

Site location

Inside a temperature-controlled laboratory (or equivalent)

Indoors

Temperature

Regulated between 20 °C and 30 °C 

Between 5 °C and 40 °C

Site altitude

No more than 2000 m

No more than 2000 m

Relative humidity

Regulated to 50% RH or less

Maximum 80% RH up to 31 °C decreasing linearly to 50% RH at 40 °C

Pollution

IEC Pollution Degree 2 (or better)

IEC Pollution Degree 2 (or better)

Availability of Electrical Connections

  • Two dedicated single-phase power bars (100…240 Vac, 10 A).

  • Power terminals (3P + PE) for connection to a 380/400/415/480 Vac three-phase supply.

Refer to 3 Phase AC Mains Supply Line to the PDU (Power Distribution Unit) for the circuit dimensioning requirements.

Please note that it is theoretically possible to have a negative net power flow (energy fed back to the grid) on the 3-phase AC power line. This could be done using, for example, a PV system or a small wind turbine on a DER input of an OP1400PR test bench. The user should note that not all electricity distribution companies will allow customers to feed energy to the grid and should contact their local electricity distributor before attempting to do so.

In addition, please note that OP1400PR-10 and OP1400PR-20 models will consume steady-state unbalanced currents on its 3-phase AC input, which could lead to penalties being imposed to the user by the local electricity distributor.

Contact your local OPAL-RT sales representative for more information if required.

Unpacking

This equipment has been packaged and shipped in secure conditions. However, when unpacking, check that the equipment has not been damaged during transportation.

If there is any visible damage or evidence of impact sustained during transit, please inform OPAL-RT Technologies immediately for instructions on how to proceed. Do not continue unpacking/installation or attempt to power on any delivered equipment.

Contact Technical Support (login ou sign-up required).

OP1400PR Test Bench Crate

The test bench cabinet and included components will be received in a crate. The following procedure must be executed to safely unpack the test bench: Uncrating a Large OPAL-RT Hardware Product.

Once the crate has been disassembled, locate the following items and ensure that they are all are present and undamaged.
Please note that certain cables are already installed inside the cabinet based on the connections & signals overview of your test bench.

Item

Description

Part Number

Image

Qty

Item

Description

Part Number

Image

Qty

Fiber-Optic Transmitters, Receivers SFP

Fiber-Optic Transceiver Module 4.25GBd 850 nm 3.3V for installation on OPAL-RT simulators to enable SFP communication with OP8110 units.

T00-0315

OP1400PR-10: 1
OP1400PR-20: 1
OP1400PR-30: 2
OP1400PR-60: 3

Fiber-Optic cable

Multimode Dplx Fiber Cable 62.5/125 LC-LC 2M to connect OPAL-RT simulators to OP8110 through SFP interface

T00-0797

OP1400PR-10: 1
OP1400PR-20: 1
OP1400PR-30: 2
OP1400PR-60: 3

Ethernet cable

CAT6 (500 MHz) UTP Network Cable - Blue 10 ft

T00-0817

For OP8110 connection - (Pre-installed)
OP1400PR-10: 1
OP1400PR-20: 1
OP1400PR-30: 2
OP1400PR-60: 3

Additionally, for all test bench models-
1x Ethernet cable included within the crate for connection to the network switch inside the cabinet, &
1x ethernet cable for simulator (if present).

Optical synchronization cable

POF Ind. Plastic Optical Fiber Patch Cords 0.65 m

T00-6615

OP1400PR-10: 0
OP1400PR-20: 0
OP1400PR-30: 1
OP1400PR-60: 2

Mini-USB cable

Cable USB A - Mini B Black R/A 3 ft

T00-0805

1

Ring Terminals to PowerLok (DC)

Cable connecting the ITECH DC output to PDU DC_IN

113-1729

image-20251211-192625.png

OP1400PR-10: 1
OP1400PR-20: 1
OP1400PR-30: 3
OP1400PR-60: 3

Note - These come installed within the cabinet.

PowerLok to banana

Cable connecting the PDU DC_OUT to the power amplifier

113-1730

image-20251212-183233.png

OP1400PR-10: 1
OP1400PR-20: 1
OP1400PR-30: 3
OP1400PR-60: 3

Note - These come installed within the cabinet.

Ring Terminals to PowerLok (AC)

Cable connecting the PDU AC_OUT to the ITECH input power

113-1731

image-20251211-192744.png

OP1400PR-10: 1
OP1400PR-20: 1
OP1400PR-30: 3
OP1400PR-60: 3

Note - These come installed within the cabinet.

Auxiliary power cable

Cable connecting from the PDU AUX to the amplifiers AUX

113-1732

image-20251211-193245.png

OP1400PR-10: 1
OP1400PR-20: 2
OP1400PR-30: 3
OP1400PR-60: 6

Note - These come installed within the cabinet.

25 cm red banana cable

Banana cable connecting the amplifier DC+ inputs of group 1 and group 2

T00-9659

OP1400PR-10: 0
OP1400PR-20: 1
OP1400PR-30: 0
OP1400PR-60: 3

25 cm black banana cable

Banana cable connecting the amplifier DC- inputs of group 1 and group 2

T00-9658

OP1400PR-10: 0
OP1400PR-20: 1
OP1400PR-30: 0
OP1400PR-60: 3

25 cm white banana cable

SKL425-E/N 4 mm safety test lead 25 cm White

T00-7535
(or T00-8896)

OP1400PR-10: 3
OP1400PR-20: 6
OP1400PR-30: 9
OP1400PR-60: 18

2m banana cable harness

SLK425-E/N 4 mm safety test lead 200 cm 4 cable harness (Red, Black, Blue and White)

113-1371

OP1400PR-10: 2
OP1400PR-20: 4
OP1400PR-30: 6
OP1400PR-60: 12

VFEM cables

Remote measurement cables for the OP8110.

113-1427

OP1400PR-10: 1 set
OP1400PR-20: 2 sets
OP1400PR-30: 3 sets
OP1400PR-60: 6 sets

ITECH Synch cable

On/Off synchronization cable

113-1588

These cables are shipped with the ITECH connectors attached.

The number of cables differs depending on the bench configuration:

OP1400PR-10: 0
OP1400PR-20: 0
OP1400PR-30: 2
OP1400PR-60: 2

Cable E-STOP to PDU

PDU control cable

113-1304

image-20260716-150158.png

1400PR-x0: 1

 

Additional components for test benches that have either the LP and/or the HP bus bar box.

Item

Description

Part Number

Image

Qty

Item

Description

Part Number

Image

Qty

VFEM cable

VFEM_sensor_Banana_80inch used with the LP bus bar

113-1428

-LP config : 2 sets
-LPHP config : 2 sets

VFEM cable

VFEM_sensor_Cosse_120inch used with the HP bus bar

113-1429

-HP config: 2 sets
-LPHP config: 2 sets

50 cm single banana cable red

SKL425-E/N 4 mm Safety Test Lead 50 cm Red

T00-7239

-LP config: 4
-HP config: 4
-LPHP config: 4

50 cm single banana cable black

SKL425-E/N 4 mm Safety Test Lead 50 cm Black

T00-7240

-LP config: 4
-HP config: 4
-LPHP config: 4

ITECH fiber-optic cable

ITECH Optical fiber cable for IT6000 and IT8000

T00-8856

(IT-E168)

-LP config: 3
-HP config: 3
-LPHP config: 3

Bus Bar control power 24VDC

Brings 24VDC power from the E-Stop Module to the bus bar box. Multiple bus bar boxes will be connected in daisy chaining.

113-1302

image-20260716-150752.png

-LP config: 1
-HP config: 1
-LPHP config: 2

Notes:
1. -LP config refers to any OP1400PR PHIL Prime test bench that has an LP Bus Bar Box installed. For example, OP1400PR-10-LP, OP1400PR-20-LP and so on.
2.-HP config refers to any OP1400PR PHIL Prime test bench that has an HP Bus Bar Box installed. For example, OP1400PR-30-HP and OP1400PR-60-HP.
3. -LPHP config refers to any OP1400PR PHIL Prime test bench that has both an LP Bus Bar Box AND an HP Bus Bar box installed. For example OP1400PR-30-LPHP and OP1400PR-60-LPHP.

Separately Packaged Equipment

To minimize the risk associated with shipping and handling, the following components are removed from the test bench before shipping and are packaged separately:

The following quantities of each item should be expected depending on the purchased test bench model:

 

OP1400PR-10 models

OP1400PR-20 models

OP1400PR-30 models

OP1400PR-60 models

 

OP1400PR-10 models

OP1400PR-20 models

OP1400PR-30 models

OP1400PR-60 models

OP8110-3

1

-

1

-

OP8110-6

-

1

1

3

IT6006C-500-30

1

-

3

-

IT6012C-500-60

-

1

-

3

Ensure that all these components have been received. Once unpacked, ensure that all items are undamaged.

Installation Procedure - Physical Assembly

There are two sections to the installation procedure:

  1. Physically assembling the rack

  2. Making the electrical connections

Please read each section in full before following the instructions. If any part is unclear or confusing, contact OPAL-RT for assistance.

Always install the boxes one at a time, never having more than one unit hanging on its slides. Failure to do so could cause tilting of the cabinet which could result in serious injury.

Physical Assembly - Mounting the DC Power supplies

Please follow the steps below:

  1. Determine the mounting height for each DC power supply by referring to the diagrams below, specific to your OP1400PR bench model. The red rectangles indicate the correct locations for the units, where the mounting screws are located on the chassis side rails.

  2. Remove the screws from the chassis side rails, reserve them for step 4.

  3. Insert the power supplies in their appropriate locations, stacking the bottommost one on the pre-installed support brackets inside the chassis and stacking the remaining supplies (if any) on top of one another.

  4. Install the previously removed screws on the side rails to fasten the power supply unit(s) in place.

OP1400PR-10

OP1400PR-20

OP1400PR-30

OP1400PR-60

OP1400PR-10

OP1400PR-20

OP1400PR-30

OP1400PR-60

image-20251112-211735.png

 

image-20251112-211735.png
image-20251112-213008.png

 

image-20251112-213418.png

 

Physical Assembly - Mounting the Power Distribution Unit (PDU)

  1. The PDU is configured with removable slides to allow easy manipulation. Carefully align the PDU with the mating slides on the chassis. Once the slides are properly aligned, slide the PDU into the chassis, pushing on the lock buttons if necessary.

  2. Secure the PDU to the chassis side rails using the screws that are already present on the side rails.

Physical Assembly - Mounting the OP8110 Amplifiers

The cabinet is configured with removable slides (as displayed below) to allow easy manipulation of the amplifiers. The following steps must be executed to install these slides on each OP8110 unit:

  1. Locate the installation height of the amplifier units using the diagrams below (OP8110-6 amplifiers must be placed on top of OP8110-3 amplifiers if both models are present). The slides are preinstalled on the chassis.

  2. Disassemble the inner portion of the slides by sliding them out and by pushing the lock button, reserve them for step 4.

  3. Detach the mounting screws from both sides of the amplifier, reserve them for step 4.

  4. Fasten the inner rail of the slides onto the amplifiers using the mounting screws.

  5. One amplifier at a time, carefully align the amplifier with the mating slides on the chassis. Once the slides are properly aligned, slide the amplifier into the chassis, pushing on the lock buttons if necessary.

  6. Mount the amplifiers to the chassis side rails using the screws that are already present on the side rails.

Slides for OP8110 mounting

In the case that an OP8110 unit needs to me removed from the rack either for an RMA or maintenance, ensure to shut down the PDU before opening the cabinet and starting to unscrew the cables.
Refer to OP1400PR PHIL Prime Test Bench Series Important Safety Information for the detailed procedure.

OP1400PR-10

OP1400PR-20

OP1400PR-30

OP1400PR-60

OP1400PR-10

OP1400PR-20

OP1400PR-30

OP1400PR-60

image-20251112-225445.png

 

image-20251112-225542.png

 

image-20251112-224940.png

 

image-20251112-224558.png

 

Installation Procedure - Electrical Wiring

The electrical installation of the OP14xx products must be performed by qualified personnel only.

Recommended wiring sequence:

  1. Grounding all the boxes in the cabinet

  2. Low-voltage wiring

  3. High-voltage wiring

  4. Synchronization cables between amplifiers

Grounding all the boxes in the cabinet

All the necessary grounding cables are located inside the cabinet and they are already connected to the cabinet ground busbar.

Grounding of PDU

The PDU has a dedicated grounding cable that must be connected to the ground terminal on the rear side of the unit. Locate the ground cable which has the following appearance:

image-20251113-200727.png

Install it in the following location on the PDU:

image-20251113-190819.png
PDU ground terminal

Grounding of OP8110 Amplifiers

Each OP8110 unit has a dedicated grounding cable that must be connected to the ground terminal on the rear side of the unit. Locate the ground cables which have the following appearance:

Install them in the following location on each OP8110 amplifier:

image-20251113-190302.png
OP8110 Ground terminal

Grounding of E-Stop Module

The E-Stop Module has a dedicated grounding cable that must be connected to the ground terminal on the rear side of the module. Locate the ground cable which has the following appearance:

Install it on the following location on the E-Stop Module:

image-20251113-191654.png
E-Stop Module Ground terminal

Grounding of Output Interface box

The Output Interface box has a dedicated grounding cable that must be connected to the ground terminal on the rear side of the box. Locate the ground cable which has the following appearance:

Install it in the following location on the Output Interface box:

image-20251113-200044.png
Output Interface Ground terminal

Grounding of LP/HP Bus Bar boxes

The LP and HP Bus Bar boxes, each have a dedicated grounding cable that must be connected to the ground terminal on the rear side of the box. Locate the ground cable for each unit which has the following respective appearance:

LP Bus Bar Ground Cable
image-20251113-200807.png
HP Bus Bar Ground Cable

Install the cable(s) on the following location on the LP/HP Bus Bar box(es), rear panel: