Page Content
Table of Contents | |||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
...
Installing
Install the OP4512 simulator on a table or in a mounting rack with sufficient space on both sides to allow proper airflow cooling (about 15 cm or 6 in.).
...
Turn on the main power switch in the back of the OP4512.
WARNING: Make sure that the main power switch at the rear of the unit is easily accessible for emergency shutdown.
Press the red power button in the front of the unit.
...
Info |
---|
See this page for more information: OP4512 Installation |
Panel | ||
---|---|---|
| ||
NEXT STEP >Activate your target RT-LAB license. |