Page Content
...
Make sure to provide all adequate and necessary ventilation (at least 10 cm or 4 inches) at the front (cooling air intake) and the rear (cooling air exhaust) of the unit.
Mounting Rack Use
UsuallyThe OP5020XG can be installed in a 19'' rack.
Normally, the rack mount brackets and handles are not assembled to the chassis.
Assemble the provided
Expand | ||
---|---|---|
|
...
| |
Hardware ListThe hardware for the rack mount brackets and handles are provided in a plastic bag.
Assembling the Brackets and HandlesFollow these simple steps to install the brackets and the handles.
|
Connecting the Cables and Powering on the Unit
...
Connect the power cord to the unit and to the appropriate power source (outlet).
Connect the Ethernet cable to the leftmost bottom network port
OPTIONAL: Connect one end of a PCIe cable to the PCIe Host adapter. The other end is connected to another unit, most likely an FPGA processor and I/O expansion unit.
Turn on the main power switch in the back.
Note |
---|
Make sure that all cables are properly connected before powering up. Make sure that the main power switch at the rear of the unit is easily accessible for emergency shutdown. |
To turn on the simulator, press the front On/Off Button.
...