Documentation Home Page ◇ Hardware Home Page
Pour la documentation en FRANÇAIS, utilisez l'outil de traduction de votre navigateur Chrome, Edge ou Safari. Voir un exemple.
OP5020XG Installation
Page Content
Tabletop Use
Make sure to provide all adequate and necessary ventilation (at least 10 cm or 4 inches) at the front (cooling air intake) and the rear (cooling air exhaust) of the unit.
Rack Mount
The OP5020XG can be installed directly in a 19'' rack.
Normally, the rack mount brackets and handles are assembled to the chassis.
Connecting the Cables and Powering on the Unit
These are the basic cabling instructions for your OP5020XG. Use the cables provided to connect your devices, as instructed.
Connect the power cord to the unit and to the appropriate power source (outlet).
Connect the Ethernet cable to the leftmost bottom network port
OPTIONAL: Connect one end of a PCIe cable to the PCIe Host adapter. The other end is connected to another unit, most likely an FPGA processor and I/O expansion unit.
Turn on the main power switch in the back.
Make sure that all cables are properly connected before powering up.
Make sure that the main power switch at the rear of the unit is easily accessible for emergency shutdown.
To turn on the simulator, press the front On/Off Button.
OPAL-RT TECHNOLOGIES, Inc. | 1751, rue Richardson, bureau 1060 | Montréal, Québec Canada H3K 1G6 | opal-rt.com | +1 514-935-2323
Follow OPAL-RT: LinkedIn | Facebook | YouTube | X/Twitter