Model name | IEEE 39-bus New England power system |
---|---|
Highlights | Well known benchmark showing the capability of ePHASORSIM to simulate a very simple transmission system using positive sequence. |
Model diagram | |
Single-phase nodes | 39 |
Generators | 10 |
Transformers | 11 |
Branches | 34 |
Loads | 20 |
Shunt | 3 |
Hardware | OP5707XG
|
Software |
|
Minimum license required | 1,000 nodes |
Results |
* Performance under transient conditions varying considerably depending on the study type, this benchmark measures the minimum achievable time-step without overruns in steady-state conditions. A rule of thumb is to consider 10 to 20 % buffer time for calculations under transient conditions. |
Benchmark | |
Performance comparison between new (OP5707XG) and previous (OP5700) hardware generations | |