Objective
Validate the advanced operation of the Festo 8857/37 inverter to regulate the DC link voltage
Description
This section presents the CPU model description and test procedure for testing the operation of the Festo 8857/37 inverter to regulate the DC link voltage.
Model Overview
The RT-LAB model consists of two subsystems:
The SM_OP5707 subsystem consists of the model part that runs on the real-time simulator
The SC_Offline_User_Interface subsystem consists of the user interface that runs on the host PC.
The subsystem consists of three areas as shown in figure 2:
The gray area is for receiving data from the simulator and monitoring the signals
The blue area labeled as “Inverters control” is used to control the simulated model or the test bench, adjust the DC reference voltage, and enable/disable the inverter control signals that are sent to the simulator.
The orange area presents important notes regarding the test instruction
This subsystem also includes three areas, as shown in figure 3.
In this subsystem, the user is presented with a SIMULINK-based model to perform advanced control over Festo energy conversion hardware.
The “OpComm” block receives the signals sent from the SC_Offline_User_Interface subsystem.
The gray area simulates the inverter DC-link using SimPowerSystems’ universal IGBT bridge.
The blue area labeled “OP8219 and OP8662 IO Interface” is used to transfer data between the target and the OP8662 unit as well as the OP8219.
The DC bus control block diagram labeled as “DC-link Voltage Regulation” in the yellow area is shown in figure 4.
A PI-based cascaded voltage and current controller is developed in this area to control the three-phase currents of the inverter based on the desired voltage of the DC link.
Test Procedure
The connections of the OP5707 to the OP8662 and to the OP8219 is demonstrated in figure 5. The connections must be performed as shown.
The connections of the Festo 8857 inverter, OPAL-RT OP8662, and OPAL-RT OP8219 are illustrated in figure 6. The user must respect the direction and location of the measurement depicted the figure.
Perform the control connections (PWM) between OPAL-RT OP8219 and Festo 8857 inverters as shown in figure 7 using the provided DB9 cables.
Ensure that all power source outputs are off
Connect the system power circuit and connection signals as shown in figures 5 to 7
Powered on the OP8662.
Ensure that the power adaptor is connected to the OP8219.
Ensure that the Festo inverter modules 8857 are powered on using the 24 V AC voltage provided by the Festo power supply 8525.
Ensure that the jumpers are always installed on the OPAL-RT OP8219 board. For all tests involved using OP8219, the jumpers need to be installed, unless otherwise stated.
Make sure that the phase voltages of the grid are properly connected to a corresponding input terminal of the inverter (A-to-A, B-to-B, and C-to-C).
The phases can be distinguished using an oscilloscope.
A Mismatch between the sequence of the phases applied to the inverter leads to the trip of the inverter when the GSC controller is activated.Launch RT-LAB.
Import the model zip file (see below) in RT-LAB.
Build, load, and execute the model.
Ensure the Lab volt power supply unit 8525 is powered on and the voltmeter’s selection knob is set to AC 4-5.
Ensure the 8509 resistive load is switched off.
Increase the variable voltage knob to set the AC line voltage level to 55 Vrms.
Select the source or “Reference Control” (figure 12):
1: The model will run a simulation of a DC-bus control.
3: The model will control the Festo hardware to regulate a DC-bus.
The inverter DC link reference for the inverter is set to ’110’ as shown in figure 13.
Enable the PWM signal for the 3-phase inverter module that is being tested, by using the toggle switch from ’0’ to ’1’.
If the user has set a DC link reference to 110 V and the supply voltage is 55 V; the following start-up results would be seen in the oscilloscope when the PWM signal is enabled.
Connect a resistive load of 240 Ω using the related switch.
The following results would be seen in the oscilloscope when the 120 Ω resistor is connected in parallel to the 240 Ω one, which leads to the drop of the total DC load to 80 Ω.
To stop the model:
Disable the PWMs for the 3-phase converter that is being tested, by using the toggle switch from ’1’ to ’0’.
Turn the variable voltage knob to ‘0 V’.
Turn off the Festo 8525, OPAL-RT OP8660, OPAL-RT OP8219, and resistive loads.
Reset the model in RT-LAB.
Conclusion
Based on the preceding tests, the hardware and software included in Festo models are declared fully functional and compliant with OPAL-RT specifications.