Page Content
After opening the package, remove the equipment and components. Locate all the items described in Standard Hardware. Make sure that they are undamaged.
Standard Hardware
The OP4610XG real-time simulator includes the following basic hardware:
Item | Description | Part Number |
---|---|---|
OP4610XG simulator | Full simulator equipped with AMD Ryzen™ 6 cores, 3.8 GHz or equivalent, 16 GB RAM, 250 GB SSD | 429-0220 |
Loopback kit | Loopback board | 126-0361 |
Loopback cable | 113-0737 | |
RJ45 cable | CAT6 (500 MHz) UTP Network Cable - Blue 3 m (10 ft) | T00-0817 |
Power cable | 1.83 m (6 ft) power cord, black (10 A,125 V) | T00-0833 |
System Integration binder | Includes system description document and test reports, RT-LAB software, OPAL-RTLinux operating system and documentation CD | N/A |
Optional Hardware
Item | Description | Part Number |
---|---|---|
MuSE transceiver | Avago AFBR-57R5APZ | T00-0315 |
MuSE cable | LC-LC multimode 850 nm optical fiber, 2 m (longer cables available) | T00-0797 |
Rack Mount Brackets and Handles Assembly (Optional)
Usually, the rack mount brackets and handles are not assembled to the chassis.
Hardware List
The hardware for the rack mount brackets and handles are provided in a plastice bag.
2x 110-3124 - 3U Rack Mount Brackets
2x T00-8185 - Pull Handles Black Anodized Alu. 8-32 x 3.5”
4x T00-6800 - Black SS Phillips Flat Head Screws 8-32 X ½” long
8x T00-8180 - Black, SS, Phillips Flat Head Screws 6-32 x 5/16” long
Assembling
Follow these simple steps to install the brackets and the handles.
For each side:
Remove the two (2) top front screws.
Put the screws away, they will be replaced with longer ones.
Assemble the rack mount bracket using 4 screws.
Do not use the screws you removed in the previous steps, they are too short.
4 screws per bracket, 6-32 x 5/16" flat head, Phillips, OPAL-RT P/N T00-8180
Assemble the handle to the bracket using two (2) screws.
2 screws per handle, 8-32 x ½” flat head, Phillips, OPAL-RT P/N T00-6800