Documentation Home Page Hardware Home Page
Pour la documentation en FRANÇAIS, utilisez l'outil de traduction de votre navigateur Chrome, Edge ou Safari. Voir un exemple.

OP4610XG Receiving and Verification

Page Content

After opening the package, remove the equipment and components. Locate all the items described in Standard Hardware. Make sure that they are undamaged.

Standard Hardware

The OP4610XG real-time simulator includes the following basic hardware:

Item

Description

Part Number

Item

Description

Part Number

OP4610XG simulator

Full simulator equipped with AMD Ryzen 6 cores, 3.8 GHz or equivalent, 16 GB RAM, 250 GB SSD

429-0220

Loopback kit

Loopback board

126-0361

Loopback cable

113-0737

RJ45 cable

CAT6 (500 MHz) UTP Network Cable - Blue 3 m (10 ft)

T00-0817

Power cable

1.83 m (6 ft) power cord, black (10 A,125 V)

T00-0833

System Integration binder

Includes system description document and test reports, RT-LAB software, OPAL-RTLinux operating system and documentation CD

N/A

Optional Hardware

Item

Description

Part Number

Item

Description

Part Number

MuSE transceiver

Avago AFBR-57R5APZ

T00-0315

MuSE cable

LC-LC multimode 850 nm optical fiber, 2 m (longer cables available)

T00-0797

Rack Mount Brackets and Handles Assembly (Optional)

Usually, the rack mount brackets and handles are not assembled to the chassis.

Hardware List

The hardware for the rack mount brackets and handles are provided in a plastice bag.

  • 2x 110-3124 - 3U Rack Mount Brackets 

  • 2x T00-8185 - Pull Handles Black Anodized Alu. 8-32 x 3.5”

  • 4x T00-6800 - Black SS Phillips Flat Head Screws 8-32 X ½” long

  • 8x T00-8180 - Black, SS, Phillips Flat Head Screws 6-32 x 5/16” long

image-20240717-151907.png

Assembling

Follow these simple steps to install the brackets and the handles.
For each side:

  • Remove the two (2) top front screws.

    • Put the screws away, they will be replaced with longer ones.

  • Assemble the rack mount bracket using 4 screws.

    • Do not use the screws you removed in the previous steps, they are too short.

    • 4 screws per bracket, 6-32 x 5/16" flat head, Phillips, OPAL-RT P/N T00-8180

  • Assemble the handle to the bracket using two (2) screws.

    • 2 screws per handle, 8-32 x ½” flat head, Phillips, OPAL-RT P/N T00-6800

If there is a unit in the rack underneath the OP4610XG, you may need to remove the 4 rubber feet by unscrewing them.

OPAL-RT TECHNOLOGIES, Inc. | 1751, rue Richardson, bureau 1060 | Montréal, Québec Canada H3K 1G6 | opal-rt.com | +1 514-935-2323
Follow OPAL-RT: LinkedIn | Facebook | YouTube | X/Twitter