Documentation Home Page ◇ RT-LAB Home Page
Pour la documentation en FRANÇAIS, utilisez l'outil de traduction de votre navigateur Chrome, Edge ou Safari. Voir un exemple.
HEI Configuration Block
Block
Mask
Description
This block was developed by Opal-RT to interface the T1H-EBC100 Ethernet Base Controller (ebc) from Host Engineering.
This block is used to configure the Host Engineering Interface (HEI) service. The first field is used to set the number of ebc required and the second is a list of their node's ids. The first field must be equal to the size of the list of the second parameter. Avoid setting an ebc id to 0. This id is reserved for online configuration through the Host Engineering software and may cause inappropriate behavior if not done correctly. Also, if there is two ebc with the same node id on the network, the initialization will fail. Make sure to configure your ebcs in consequence.
Parameters
Ebc count | Specify the number of Ethernet Base Controllers. |
---|---|
Node list | Specify the ids of the Ethernet Base Controllers. The size of this list must be equal to the ebc count previously specified. |
Inputs
No inputs.
Outputs
No outputs.
Characteristics and Limitations
Time Limitation
Step size supported without overrunning (processor 2.4 GHz): 30 µs
Notice: even though the model can run at 30 us, the relays themselves won't be updated that fast. The constructor documentation specified that a time delay of 15 ms in the worst case should be expected. All commands meanwhile will be ignored.
Ethernet Base Controller Supported
T1H-EBC100
Power Supply Module: T1K-01AC
Specification | T1K-01AC |
---|---|
Wire Guage | Solid: 24 - 12 AWG |
Stranded: 24 - 12 AWG | |
Recommended Torque | 4.43 - 5.31 lb-in |
(0.5 - 0.6 Nm) | |
Input Voltage Range | 110/220VAC (85-264VAC) |
Input Frequency | 50/60Hz (47-63Hz) |
Max. Power | 50VA |
Max. Inrush Current | 20A |
Insulation Resistance | > 10M ohm @ 500VDC |
Voltage Withstand(Dielectric) | 1 min. @ 1500VAC between primary, secondary and field ground |
Auxiliary 24VDC supply | 300mA max. |
Wiring example:
For further information on the power supply, refer to the Host Engineering documentation.
Direct Feedthrough | N/A |
---|---|
Discrete sample time | N/A |
XHP support | Yes |
Work offline | Yes |
OPAL-RT TECHNOLOGIES, Inc. | 1751, rue Richardson, bureau 1060 | Montréal, Québec Canada H3K 1G6 | opal-rt.com | +1 514-935-2323
Follow OPAL-RT: LinkedIn | Facebook | YouTube | X/Twitter