The Load Management Control block is responsible for regulating the flow of the load (active power) through the Point of Common Coupling (PCC), when the microgrid is connected to an external AC-grid, by allowing the user to adjust the active power settings.

Mask and Parameters

The Load Management Controller block contains the following configuration mask:

Name

Unit

Description

Name

Unit

Description

Sampling time

s

Time step for the simulation

Diesel minimum power

pu

Minimum values for Diesel generation

Diesel maximum power

pu

Maximum values for Diesel generation

BESS maximum power

pu

Maximum values available for BESS

Load shedding maximum reduction

pu

Maximum values of Load shedding reduction

Inputs, Outputs and Signals Available for Monitoring

Inputs

Name

Unit

Description

Name

Unit

Description

RER P ref

pu

Combined reference powers for all Renewable Energy Resources (RERs) (WT+PV)

Total load P ref

pu

Combined reference powers for all loads (DR, Sheddable, Critical and PHIL)

Sheddable load P ref

pu

User-defined power reference for sheddable load

Excess load P ref

pu

Excess load within the Microgrid (greater than 0 means load must be reduced)

Demand Response load P ref

pu

User-defined power reference for Demand Response (DR) load

Islanded

-

Specifies whether the Microgrid is islanded/Grid connected (0 = Grid connected, 1 = islanded)

Dispatch mode

-

Internal mode of the real-power (dispatch) controller

Outputs

Name

Unit

Description

Name

Unit

Description

Total load reduction

pu

Total amount of load reduction used to adjust the BESS's power reference. 

Demand Response load P ref

pu

Power reference sent to the demand response load

Demand Response load reduced

-

Status of the demand response load (0= load is not reduced, 1 = load is reduced)

Sheddable load P ref

pu

Power reference sent to the sheddable load

Load shedded

-

Status of the sheddable load (0 = load is not shedded, 1= load is shedded)

 