Example | HVAC 230kV 7Bus


Location

This example model can be found in the software under the category "Benchmarks" with the file name "HVAC_230kV_7Bus.ecf".

Description

The HVAC 230kV 7Bus model can be used to evaluate electromagnetic transient overvoltage caused by line switching, fault initiation, and clearing. It can also be used to test the performance of real protection relays interfaced with the simulators through digital to analog converters and power amplifiers or with the new IEC61850 Ethernet communication protocol used with model relays.  This benchmark model contains four synchronous machines with built-in voltage and speed regulators, one voltage source, six two-winding transformers, seven constant parameters lines, two loads, and works at three voltage levels 13.8 kV, 110 kV, and 230 kV. During the simulation, any kind of fault, including single-line-to-ground, three-phase, and two-phase-to-ground faults, can be introduced in different locations. For this example, three three-phase faults are considered on Buses 7, 12, and 14. The fault times can be modified as required by the user, and new faults can also be added on other buses.

All the machines of the generation system are controlled by internal exciters, governors (speed regulators), and stabilizers. The user can change this configuration by double-clicking on the machine subsystem and changing the values in the mask. The following is a snapshot of the machine configuration:.

Figure 1: Synchronous machine configuration settings


Simulation and Results

As part of the example model setup, the user can perform three types of scenarios. The user can enable or disable three three-phase faults on different model buses.

Scenario 1: Three-phase fault on Bus 7

The first scenario is about introducing a three-phase fault on Bus 7 at 0.1s by 0.1s. This scenario gives the user an idea of reliability in power systems, and how it reacts after clearing a fault. The user can change these settings by going into the fault subsystem and changing the values of T1 and T2, configuring the fault activation and clear times, respectively. By default only this fault is enabled,  it is necessary to check the Enable option within the fault subsystem called Fault1 and also check the disable option within the faults subsystem called Fault2 and Fault3. 

Figure 2: Fault configuration settings


The following are the results from ScopeView following the first scenario, a three-phase fault on Bus 7.

Figure 3: Bus Voltage and Fault current with a three-phase to-ground fault at Bus 7

Figure 4: Bus 7 voltage and grid current with a three-phase to ground fault at Bus 7

Figure 5. Machine Terminal Voltages and Speeds with a three-phase to-ground fault at Bus 7

Scenario 2: Three-phase fault on Bus 12

The model is also equipped with a three-phase fault on Bus 12. Similar to scenario 1, the default times for this fault are set to activate at 0.1s and clear 0.1s later. By default this fault is disabled and only the three-phase Fault1 described in the scenario1 is enabled. To activate only this fault it is necessary to check the Enable option within the fault subsystem called Fault2 and also check the disable option within the faults subsystem called Fault1 and Fault3. 

The following are the results from ScopeView following the three-phase fault on Bus 12.

Figure 6: Bus Voltage and Fault current on Bus 7 with a three-phase to-ground fault at Bus 12


Figure 7: Bus 7 voltage and grid current with a three-phase to ground fault at Bus 12


Figure 8. Machine Terminal Voltages and Speeds with a three-phase to-ground fault at Bus 12


Scenario 3: Three-phase fault on Bus 14

The model is also equipped with a three-phase fault on Bus 14. Similar to scenario 1 and scenario 2, the default times for this fault are set to activate at 0.1s and clear 0.1s later. By default this fault is  Disabled. To activate only this fault it is necessary to check the Enable option within the fault subsystem called Fault3 and also check the disable option within the faults subsystem called Fault1 and Fault2. 

The following are the results from ScopeView following the three-phase fault on Bus 14.

Figure 9: Bus Voltage and Fault current on Bus 7 with a three-phase to-ground fault at Bus 14


Figure 10: Bus 7 voltage and grid current with a three-phase to-ground fault at Bus 14


Figure 8. Machine Terminal Voltages and Speeds with a three-phase to-ground fault at Bus 14