Voltage Protection
This block is used to detect abnormal conditions in the grid’s voltage. For this purpose, a set of regions can be specified by the user as specified in [1]. A maximum of 5 different regions can be specified for over and under voltage events, respectively. Also, this block can identify the power injection mode in each of the regions (mandatory operation, momentary cessation, or cease to energize). This power injection mode is defined in the Voltage Ride-Through (VRT) Mode output.
Mask and Parameters
Over-Voltage Range
Name | Description | Unit |
---|---|---|
Number of Over-Voltage Points | Number of over-voltage regions delimited by a set of voltage points | - |
Voltage Points [Point1,…, Point 5] | Low-limit voltage values before reaching the respective over-voltage trip region | pu |
Time Points [Point1,…, Point 5] | Amount of time that the converter must operate in a voltage region before tripping | s |
Operating Mode | Specifies the power injection mode in the VRT Mode output. 1: Mandatory Operation, 2: Momentary Operation, 3: Cease to Energize | - |
Under-Voltage Range
Name | Description | Unit |
---|---|---|
Number of Under-Voltage Points | Number of under-voltage regions delimited by a set of voltage points | - |
Voltage Points [Point1,…, Point 5] | Low-limit voltage values before reaching the respective under-voltage trip region | pu |
Time Points [Point1,…, Point 5] | Amount of time that the converter must operate in a voltage region before tripping | s |
Operating Mode | Specifies the power injection mode in the VRT Mode output. 1: Mandatory Operation, 2: Momentary Operation, 3: Cease to Energize | - |
Inputs
Name | Description |
---|---|
Vpu | Grid voltage at the point of coupling |
Outputs
Name | Description |
---|---|
UOV_Trip | Trip signal for under or over-voltage events |
VRT_Mode | Voltage ride-through mode signal (1: Mandatory Operation, 2: Momentary Cessation, 3: Cease to Energize) |
References
[1] IEEE, "IEEE Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces," IEEE Std 1547-2018 (Revision of IEEE Std 1547-2003), no. doi: 10.1109/IEEESTD.2018.8332112, pp. 1-138, 2018.
[2] IEEE, "IEEE Standard Conformance Test Procedures for Equipment Interconnecting Distributed Energy Resources with Electric Power Systems and Associated Interfaces," IEEE Std 1547.1-2020, pp. 1-282, 2020.
Intellectual Property Disclaimer
Natural Resources Canada owns all intellectual property rights in the Smart Inverter Modelling Toolbox software and related products.
OPAL-RT TECHNOLOGIES, Inc. | 1751, rue Richardson, bureau 1060 | Montréal, Québec Canada H3K 1G6 | opal-rt.com | +1 514-935-2323
Follow OPAL-RT: LinkedIn | Facebook | YouTube | X/Twitter