Documentation Home Page Hardware Home Page
Pour la documentation en FRANÇAIS, utilisez l'outil de traduction de votre navigateur Chrome, Edge ou Safari. Voir un exemple.

OP8120 Installation and Operation

The OP8120 chassis has rails that allow quick installation of the modules in the appropriate slot.

Installation drawing

  • Simply position the module in alignment with the desired slot and push in firmly until the connector is firmly pressed into the backplane connector.
  • When the module is in place, affix using the 4 screws provided.
  • When all modules are in place, plug the power cable of the power supply (located in the back of the unit) to a power source.
  • Power on the unit, using the power switch at the front. The LED should light up.
  • The conditioning chassis is now operational.



Note: For details on how to operate each module, please consult the sections pertaining to the module in question.


OPAL-RT TECHNOLOGIES, Inc. | 1751, rue Richardson, bureau 1060 | Montréal, Québec Canada H3K 1G6 | opal-rt.com | +1 514-935-2323
Follow OPAL-RT: LinkedIn | Facebook | YouTube | X/Twitter