Documentation Home Page ◇ HIL2GO Main Menu
Pour la documentation en FRANÇAIS, utilisez l'outil de traduction de votre navigateur Chrome, Edge ou Safari. Voir un exemple.
HIL2GO-410 - System Power On and Power Off Sequences
Page Content
TARGET COMPUTER RE-BOOT WARNING: Follow the Power On/Off sequence as indicated below. Failure to do so may require rebooting of the Target.
Power on Sequence
Power on the OP4810-IO
Power on the OP5025XG
If the OP525XG (which is running HYPERSIM on the target) is powered on before the OP4810-IO, HYPERSIM won't be able to detect the present of OP4810-IO FPGA Processor and I/O Expansion Units.
Power off Sequence
Power off the OP5025XG
Power off the OP4810-IO
Disconnecting or powering off the OP4810-IO during operation will require a power off sequence followed by a power on sequence in order to resume reliable operation.
OPAL-RT TECHNOLOGIES, Inc. | 1751, rue Richardson, bureau 1060 | Montréal, Québec Canada H3K 1G6 | opal-rt.com | +1 514-935-2323
Follow OPAL-RT: LinkedIn | Facebook | YouTube | X/Twitter