Documentation Home Page ◇ HYPERSIM Home Page
Pour la documentation en FRANÇAIS, utilisez l'outil de traduction de votre navigateur Chrome, Edge ou Safari. Voir un exemple.
Benchmarks | Two Substations with 100 km Transmission Line
Model name | Two substations with 100 km transmission line |
---|---|
Highlights |
Capable of handling a high number of closely located switches per task |
Model diagram | |
Single-phase nodes | 129 |
Sources (3φ) | 8 |
Transformers (3φ) | 3 |
Single-circuit lines (3φ, Bergeron model) | 1 (with embedded fault breaker) |
Breakers (3φ) and faults (4φ) | 56 + 25 = 81 |
Hardware | OP5707XG
|
Software |
|
Minimum license required | HXG Plus (1 core, 180 nodes) |
Results |
* Performance under transient conditions varying considerably depending on the study type, this benchmark measures the minimum achievable time-step without overruns in steady-state conditions. A rule of thumb is to consider 10 to 20 % buffer time for calculations under transient conditions. |
Benchmark | |
Performance comparison between new (OP5707XG) and previous (OP5700) hardware generations | |
OPAL-RT TECHNOLOGIES, Inc. | 1751, rue Richardson, bureau 1060 | Montréal, Québec Canada H3K 1G6 | opal-rt.com | +1 514-935-2323
Follow OPAL-RT: LinkedIn | Facebook | YouTube | X/Twitter