Documentation Home Page ◇ HYPERSIM Home Page
Pour la documentation en FRANÇAIS, utilisez l'outil de traduction de votre navigateur Chrome, Edge ou Safari. Voir un exemple.
Benchmarks | IEEE 39-Bus New England Power System
Model name | IEEE 39-bus New England power system |
---|---|
Highlights | Only simulation tool capable of simulating this network on 1 core at 24 us |
Model diagram | |
Single-phase nodes | 487 |
Generators (3φ, synchronous) | 10 |
Sources (3φ) | 1 |
Transformers (3φ, linear) | 1 |
Transformers (3φ, nonlinear) | 29 |
Single-circuit lines (3φ, Bergeron model) | 34 |
Dynamic loads (3φ) | 19 |
Breakers (3φ) | 1 |
Hardware | OP5707XG
|
Software |
|
Minimum license required | HXG Max (1 core) |
Results |
* Performance under transient conditions varying considerably depending on the study type, this benchmark measures the minimum achievable time-step without overruns in steady-state conditions. A rule of thumb is to consider 10 to 20 % buffer time for calculations under transient conditions. |
Benchmark | |
Performance comparison between new (OP5707XG) and previous (OP5700) hardware generations | |
OPAL-RT TECHNOLOGIES, Inc. | 1751, rue Richardson, bureau 1060 | Montréal, Québec Canada H3K 1G6 | opal-rt.com | +1 514-935-2323
Follow OPAL-RT: LinkedIn | Facebook | YouTube | X/Twitter