Documentation Home Page HYPERSIM Home Page
Pour la documentation en FRANÇAIS, utilisez l'outil de traduction de votre navigateur Chrome, Edge ou Safari. Voir un exemple.

Step 5: Drawing a Power System

A bus and a POW (Point-On-Wave) block are required to start a new model. These can both be found in the Network Tools library, along with other components for advanced modeling, such as Simulink-imported models and user-coded models.

The POW is required for acquisition synchronization in ScopeView, and is mandatory in every model with network components.

POW Block
POW Block

Simply drag and drop a component on the schematic to add it.

From the Network Sources library, add an AC V source and connect it to the POW previously added. 

To connect two components, left-click from a connector of the first component to a connector of the second component.

Once done, you can click on the signal to see all connected signals (yellow) and connectors (light blue).

Connecting components
Connecting components

To change the signal to a 3-phase signal, right-click the signal, then select Line Type, then 3-Phase Signal.

To delete all selected signals (highlighted in yellow), press Delete on your keyboard or use the right-click menu.

To remove only one branch of a signal, use the Zap tool in the Home toolbar. The Tools group includes common operations for signals.

For more on practical shortcuts, see Common Keyboard Shortcuts.

OPAL-RT TECHNOLOGIES, Inc. | 1751, rue Richardson, bureau 1060 | Montréal, Québec Canada H3K 1G6 | opal-rt.com | +1 514-935-2323
Follow OPAL-RT: LinkedIn | Facebook | YouTube | X/Twitter