Documentation Home Page ◇ HYPERSIM Home Page
Pour la documentation en FRANÇAIS, utilisez l'outil de traduction de votre navigateur Chrome, Edge ou Safari. Voir un exemple.
Load Management
The Load Management Control block is responsible for regulating the flow of the load (active power) through the Point of Common Coupling (PCC), when the microgrid is connected to an external AC-grid, by allowing the user to adjust the active power settings. This block is part of the microgrid library from the OP1420, and should be used along with the other blocks.
Mask and Parameters
This block is part of the microgrid library from the OP1420, and should be used along with the other blocks.
Name | Unit | Description |
---|---|---|
Diesel minimum power | pu | Minimum values for Diesel generation |
Diesel maximum power | pu | Maximum values for Diesel generation |
BESS maximum power | pu | Maximum values available for BESS |
Load shedding maximum reduction | pu | Maximum values of Load shedding reduction |
Inputs, Outputs and Signal Available for monitoring
Inputs
Name | Unit | Description |
---|---|---|
Pref RER | pu | Combined reference powers for all Renewable Energy Resources (RERs) (WT+PV) |
P ref Total Load | pu | Combined reference powers for all loads (DR, Sheddable, Critical and PHIL) |
P ref Shedable Load* | pu | User-defined power reference for sheddable load |
P ref Excess Load | pu | Excess load within the Microgrid (greater than 0 means load must be reduced) |
P ref Demand Response Load* | pu | Excess load within the Microgrid (greater than 0 means load must be reduced) |
Islanded | - | Specifies whether the Microgrid is islanded/Grid connected (0 = Grid connected, 1 = islanded) |
Dispatch mode | - | Internal mode of the real-power (dispatch) controller |
Outputs
Name | Unit | Description |
---|---|---|
Total Load Reduction | pu | Total amount of load reduction used to adjust the BESS's power reference. |
P ref Demand Response Load | pu | Power reference sent to the demand response load |
Demand Response Load Reduction | - | Status of the demand response load (0= load is not reduced, 1 = load is reduced) |
P ref Sheddable Load | pu | Power reference sent to the sheddable load |
Load Shedded | - | Status of the sheddable load (0 = load is not shedded, 1= load is shedded) |
OPAL-RT TECHNOLOGIES, Inc. | 1751, rue Richardson, bureau 1060 | Montréal, Québec Canada H3K 1G6 | opal-rt.com | +1 514-935-2323
Follow OPAL-RT: LinkedIn | Facebook | YouTube | X/Twitter