Documentation Home Page ◇ Hardware Home Page
Pour la documentation en FRANÇAIS, utilisez l'outil de traduction de votre navigateur Chrome, Edge ou Safari. Voir un exemple.
OP7000V2 Receiving and Verification
Before beginning to install your system, verify that all the standard (and optional) components are present.
After opening the package, remove the equipment and components. Make sure that all the required items described in the Standard Hardware table below are in the box and undamaged.
Standard Hardware
The OP7000V2 chassis includes the following basic hardware:
Item | Description |
---|---|
OP7000V2 | Includes mechanical enclosure, Primary FPGA, optional Secondary FPGA cards, and I/O cards, OP7461 PCIe interface and OP7832 synchronization cards (the latter two only required for PCIe configuration). |
PCIe cable | Required only if the OP7000V2 is directly connected to the simulator. Not required if the OP7000V2 is used in MuSE remote configuration. |
LC-LC multimode optical fiber and SFP transceivers | Required only if the OP7000V2 is used in MuSE remote or MuSE central mode, or for high-speed digital communication with other devices. |
BNC cables (4), RJ45 cables (4) | Used for the front I/O or monitoring cards and the RJ45-BNC monitoring panel. |
DB37 cables or plastic optical fiber cables | Used for connection of the back I/O cards with external devices |
Power cable | Required for powering the unit. typically 1.83 m (6’) power cord, black (10A 125V) |
OPAL-RT strongly recommends the use of anti-static wrist straps whenever handling any electronic device provided by OPAL-RT. Damage resulting from electrostatic charges is not covered by the manufacturer's warranty.
OPAL-RT TECHNOLOGIES, Inc. | 1751, rue Richardson, bureau 1060 | Montréal, Québec Canada H3K 1G6 | opal-rt.com | +1 514-935-2323
Follow OPAL-RT: LinkedIn | Facebook | YouTube | X/Twitter